When it’s done, the four-block project will be able to drain 17,000 cubic metres of water per year from the roadway — as much water as approximately seven Olympic-sized swimming pools.
Latest Canada News and Updates - iCanada.Online
Latest Canadian News and Updates
When it’s done, the four-block project will be able to drain 17,000 cubic metres of water per year from the roadway — as much water as approximately seven Olympic-sized swimming pools.